Sunday, March 24, 2013

Ministry at El Refugio

Andrew Burger tackling
the arch of the wall
Part of the continuing ministry LIFT has had with El Refugio has been to be the many hands that make big projects light work.  Those in ministry at El Refugio training center are very grateful for the faithful help of teams coming and completing work that would otherwise take them weeks to accomplish and a lot of time away from them investing directly in the ministries at El Refugio. The following are pictures of the LIFT 29 team doing a variety of projects over the period of two days: building a 30’ cross at an outdoor worship area, a new large-group campfire pit with stadium seating, a retaining wall for a high ropes course element, a platform for the zip line, a new storage locker for climbing gear, scraping and painting the main entrance gate and fence, and planting hundreds of cactus along the boundary line.  There also is a photo of the 40’ state-of-the-art climbing tower that LIFT has helped fund and build over the past three years.
Tim Trezise


No comments:

Post a Comment